Figure 10.22 Hydrological changes associated with construction and expansion of the Iqaluit airport. The left panels show the natural hydrological settings of two areas (1948). The right panels show post-construction and post-expansion conditions (2006) (reproduced from Mathon-Dufour, 2011).

Type:
Language:
Updated:
Size:
AI
Language:
English
Updated:
29/01/2024 11:31:52
Size:
17.0MB
JPG
Language:
English
Updated:
29/01/2024 11:31:52
Size:
355KB

Publication: Adaptation Actions for a Changing Arctic: Perspectives from the Baffin Bay/Davis Strait Region

Page number: 283

Type: Photo

Caption: Figure 10.22 Hydrological changes associated with construction and expansion of the Iqaluit airport. The left panels show the natural hydrological settings of two areas (1948). The right panels show post-construction and post-expansion conditions (2006) (reproduced from Mathon-Dufour, 2011).

Location: Iqaluit, Nunavut, Canada

Copyright: Arctic Monitoring and Assessment Programme (AMAP)

Cartographer / Designer: Burnthebook.co.uk